Some Example projects
Education (Page 1)

Bishop Grosseteste College – Internal Remodeling

Client: Bishop Grosseteste
University College
Lincoln LN1 3DY
Timescale: 9 weeks
Value: £75k
Project:
Internal remodelling of Student Union, Art
department and various classrooms. Dance studios and
music rooms. Soundproofing, ground works and drainage.
Base Two: Stripping out of existing fittings, breaking
out dividing wall, new benching and kitchen
area. Art Department: Removal of
gallery providing cupboards at each
end of the room. Student Support: Disabled access
increasing door opening to meet DDA
requirements. Opening up entrance and
kitchen area. Early Years: New fenced
yard. Performing Arts: Mirroring to end wall 15 mtrs x
2.4 mtrs. Garage base and drainage system to
workshops.
Improving electrics and decoration to all areas.

St Peter at Gowts School -
Extension & Refurbishment
Client: LCC / HBS
Timescale: 7 weeks each.
Value: £40k & £30k
Project
: Extension and Toilet refurbishment at St Peter at Gowts
School, High Street, Lincoln.
New reception entrance lobby, security,
head office, extension to staff room and
disabled toilet. Raft foundation & flat roof.
New lighting, cubicles, vanity units, sinks
and WC to
children’s toilet areas.

Grantham Ambergate School – Domestic Science

Client: HBS / LCC
Timescale: 8 weeks
Value: £25k
Project:
Remodeling of existing 1st Floor classroom to form a
special needs domestic science room.
Install preparation areas, cookers & extraction systems, water
heaters and drainage

Scotter Primary School – Disabled adaptations
Client: HBS /LCC
Timescale: 12 weeks
Value: £50k
Project:
Extension to form disabled
ramps and WC. Install steel lintels over
existing openings and make good
brickwork. Construct flat roof. Divert
existing pipe work. Construct wooden
floor on hangers. New
radiators, Install
new door openings, stud walls and casings. Fit new toilet,
shower base and basin. Install plaster boarding, plastering
and skim walls. Paint to all walls, tiling in toilet, reconnect
existing drain pipes. Install ‘Polysafe’ flooring. Form new
disabled ramps to hall and play ground.

Ash Villa School, Sleaford - Reception & Lobby

Client: LCC / HBS
Timescale: 12 weeks
Value: £30K
Project:
New reception office,
waiting area, link corridor,
disabled ramp and canopy.